In 2017, Tatham Engineering was retained to design a replacement reservoir and booster pumping station. The new facility consists of: a 1,100 m³ grade-level reservoir with an attached booster pumping station equipped with four high-lift pumps providing a capacity of 109 L/s, chlorine disinfection equipment, and various connections to existing watermains. Substantially performed in November 2019, the new facility enhances the community of Churchill by providing fire flow protection to existing residents, as well as water supply for future developments. The architectural features of the building were designed to complement adjacent residences, and the area around the facility was landscaped including tree plantings to fit with the adjacent park land.

SERVICES

  • topographic survey
  • preliminary & detailed design
  • secure approvals
  • tender administration
  • contract administration
  • construction inspection