As the Craighurst community prepared for significant residential growth, the need for a reliable, long-term drinking water supply became critical. Tatham was retained by Georgian Communities as prime consultant and construction contract administrator to design and deliver a water reservoir and booster pumping station (BPS) for the Craighurst Crossing development.
Tatham’s scope encompassed the design and construction of an in-ground reinforced concrete water reservoir, an at-grade BPS, and all associated infrastructure to connect the new facility to the water distribution network.
From the outset, the project presented a unique set of challenges. The team worked within a constrained triangular lot occupied by a drilled groundwater well, situated between Horseshoe Valley Road, a protected natural area, and a residential property. Navigating this tight envelope, alongside a complex construction schedule and multiple project stakeholders, demanded precise coordination and creative problem-solving at every stage.
The state-of-the-art facility opened in 2025 and now provides a dependable drinking water supply designed to ultimately serve the entire Craighurst community and future developments.
Electrical
Services
- preliminary & detailed design
- hydraulic modelling
- contract administration
- construction inspection
- stakeholder & agency coordination