November 2, 2022 – Notice of Study Completion

The City of Orillia has completed a Class Environmental Assessment (Class EA) for proposed upgrades to the Bayview Sewage Pumping Station (SPS), located at 406 Bayview Parkway. The Class EA identified and evaluated alternatives to improve the capacity and operation of the SPS, and to bring the SPS in compliance with current codes and guidelines. The preferred solution is to construct a new SPS.

The Class EA was completed in accordance with the Schedule B requirements of the Municipal Engineers Association (MEA) Municipal Class Environmental Assessment (October 2000, amended in 2007, 2011 and 2015).

A Project File, documenting the Class EA process is posted for review and comments on the City’s project webpage at orillia.ca/bayviewsps. Comments can be submitted using the online comment form or by e-mail to the contacts below. Comments will be accepted until December 2, 2022 and will be taken into consideration and included in the final Project File. Comments are collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act and will be part of the public record.

If you have any questions or concerns, and/or would like to be added to the study’s direct mailing list, please contact one of the study representatives listed below:

Stephen Gendron, P.Eng.
City of Orillia
Manager of Environmental Engineering,
Assets and Capital Projects
50 Andrew St. S., Suite 300
Orillia, ON, L3V 7T5
Tel: 705-325-2212
Email: sgendron@orillia.ca

Rod Langford, C.E.T., LET
Tatham Engineering Limited
Senior Technologist, Project Manager
10 Diana Dr., Building 8, Unit 7
Orillia, ON, L3V 8K8
Tel: 705-325-1753
Email: rlangford@tathameng.com

If concerns that this project may have potential adverse impacts on protected Aboriginal and treaty rights that cannot be resolved in discussions with the City of Orillia, a person or party may request the Minister of the Environment, Conservation and Parks (MECP) issue an order for a project to comply with Part II of the Environmental Assessment Act (Section 16(6)) or meet further conditions. Section 16(6) Order requests must be sent to the Minister and the Director of Environmental Assessment Branch at the addresses below. A copy of the request must also be sent to the contacts above.

Minister, MECP
77 Bay Street, 5th Floor
Toronto, ON, M7A 2J3
minister.mecp@ontario.ca

Director, Environmental Assessment Branch, MECP
135 St. Clair Avenue West, 1st Floor
Toronto, ON, M4V 1P5
EABDirector@ontario.ca

If there is no Section 16(6) Order request received by December 2, 2022, the City intends to proceed with final design and construction of the preferred solution, as presented in the planning documentation.

This notice was first issued November 2, 2022.