by Mya Vickerage | Jul 7, 2025
← PROJECTS Trail System Pedestrian Bridge Replacements and Rehabilitation HANOVER, ON Tatham Engineering was retained by the Town of Hanover to complete a Schedule B Municipal Class Environmental Assessment (EA) and detailed design for the replacement of three...
by Mya Vickerage | Jul 7, 2025
← PROJECTS Meaford Bridge 037 Rehabilitation GREY COUNTY, ON Originally constructed around 1975, Bridge 037 spans Pete’s Creek on Sykes Street in the Town of Meaford. The structure featured gabion basket walls extending along the streambanks from each corner; however,...
by Mya Vickerage | Jul 7, 2025
← PROJECTS Port Carling Retaining Wall Replacement MUSKOKA LAKES, ON In late 2022, a portion of an aging stacked cobblestone retaining wall in the heart of Port Carling failed, prompting safety concerns. Tatham was engaged to conduct an emergency inspection and...
by Tatham Engineering | May 1, 2025
← PROJECTS Acton Island Bridge Rehabilitation MUSKOKA LAKES, ON Tatham was retained for the design and rehabilitation of the Acton Island Bridge, a 100-meter, single-lane bridge located on Muskoka Road 29 in the Township of Muskoka Lakes. As the only point of road...
by Tatham Engineering | May 1, 2025
← PROJECTS Sandy Cove Creek Realignment BARRIE, ON Tatham was retained to provide detailed design and construction support services for the re-alignment and naturalization of Sandy Cove Creek. Located near Mapleview Drive East in Barrie, the realignment of this...