by Tatham Engineering | Oct 3, 2024
← PROJECTS Collingwood WPCPGenerator Replacement COLLINGWOOD, ON The Town of Collingwood’s water pollution control plant (WPCP) required a replacement of their existing indoor diesel engine generator and Automatic Transfer Switch (ATS). The intent of the project was...
by Tatham Engineering | Oct 3, 2024
← PROJECTS Ruperts Landing Electrical Upgrades COLLINGWOOD, ON Our team was retained to replace all existing lighting bollards and concrete bases within Ruperts Landing, a gated residential community. The existing bollards throughout the pathways, including the...
by Tatham Engineering | Oct 3, 2024
← PROJECTS Guelph EMS Building Renovation GUELPH, ON The City of Guelph was looking for ways to improve call times for the Guelph-Wellington Paramedic Service. While the City’s EMS Teams are currently meeting their time response standards, moving to the downtown area...
by Tatham Engineering | Oct 1, 2024
← PROJECTS Second Street EV Chargers COLLINGWOOD, ON Tatham was retained by EPCOR for the design of required pole upgrades and electrical service to accommodate the installation of six electric vehicle charging stations and the upgrade of existing event power...
by Tatham Engineering | Oct 1, 2024
← PROJECTS Yonge Go Village Stormwater Management Pond BARRIE, ON Tatham Engineering completed the detailed design of the Yonge – GO Village stormwater (SWM) pond, located in the City of Barrie. The SWM pond is designed to provide water quality and quantity control...