by Tatham Engineering | May 1, 2025
← PROJECTS Acton Island Bridge Rehabilitation MUSKOKA LAKES, ON Tatham was retained for the design and rehabilitation of the Acton Island Bridge, a 100-meter, single-lane bridge located on Muskoka Road 29 in the Township of Muskoka Lakes. As the only point of road...
by Tatham Engineering | May 1, 2025
← PROJECTS Bala Falls Bridge Rehabilitation MUSKOKA LAKES, ON Since 2015, Tatham has provided ongoing engineering and technical services to the Bala Falls Bridge – a long-time fixture in the Township of Muskoka Lakes with original construction dating back to the...
by Tatham Engineering | May 1, 2025
← PROJECTS Milford Bay Bridge Replacement MUSKOKA LAKES, ON Tatham completed the preliminary and detailed design for the replacement of a single-span concrete bridge located in Milford Bay. The aging structure was replaced with a new concrete deck on precast adjacent...
by Tatham Engineering | Apr 30, 2025
← PROJECTS Town of Innisfil Road Rehabilitation INNISFIL, ON Tatham was retained for the rehabilitation of four sections of road in the Town of Innisfil. Our Transportation team provided detailed engineering design and construction services for the 5th Line (between...
by Tatham Engineering | Apr 30, 2025
← PROJECTS Brechin Transportation Study RAMARA, ON Tatham was retained by the Township of Ramara to complete a transportation study for the Town of Brechin, located on the east shore of Lake Simcoe. The study involved the review of future development, potential impact...