Milford Bay Bridge Replacement

Milford Bay Bridge Replacement

← PROJECTS Milford Bay Bridge Replacement MUSKOKA LAKES, ON Tatham completed the preliminary and detailed design for the replacement of a single-span concrete bridge located in Milford Bay. The aging structure was replaced with a new concrete deck on precast adjacent...
Town of Innisfil Road Rehabilitation

Town of Innisfil Road Rehabilitation

← PROJECTS Town of Innisfil Road Rehabilitation INNISFIL, ON Tatham was retained for the rehabilitation of four sections of road in the Town of Innisfil. Our Transportation team provided detailed engineering design and construction services for the 5th Line (between...
Brechin Transportation Study

Brechin Transportation Study

← PROJECTS Brechin Transportation Study RAMARA, ON Tatham was retained by the Township of Ramara to complete a transportation study for the Town of Brechin, located on the east shore of Lake Simcoe. The study involved the review of future development, potential impact...
Muskoka Road 34 Culverts

Muskoka Road 34 Culverts

← PROJECTS Muskoka Road 34 Culverts GEORGIAN BAY, ON Tatham Engineering was retained to review the hydraulic capacity of twin 1.8 metre diameter CSP culverts immediately downstream of a Trent Severn Waterway Dam on 6 Mile Lake. The culverts were found to be severely...
Black Bridge

Black Bridge

← PROJECTS Black Bridge Rehabilitation THE BLUE MOUNTAINS, ON The Black Bridge is a designated heritage concrete bowstring arch structure located in the Town of The Blue Mountains. Initially, Tatham Engineering provided a load posting recommendation for the structure...