by Tatham Engineering | Dec 30, 2024
← PROJECTS Taylor’s Creek Realignment COLLINGWOOD, ON The realignment and reconstruction of 600 metres of Taylor’s Creek and the construction of 2 culvert crossings, was completed for flood management associated with abutting residential developments. The work...
by Tatham Engineering | Dec 30, 2024
← PROJECTS Church Street Sewage Pumping Station HUNTSVILLE, ON Following the completion of an infiltration/inflow study in 2009 and a Schedule B Class EA study in 2012, Tatham Engineering completed the design, secured approvals and provided contract administration and...
by Tatham Engineering | Dec 30, 2024
← PROJECTS Payette Drive Reservoir PENETANGUISHENE, ON The Payette drinking water system, rated at 11,000 m3/day, comprises 3 wells, 2 pumping stations (Payette Drive and Robert Street West) and 3 storage facilities (Payette Drive, Centennial Drive and Robert Street...
by Tatham Engineering | Dec 27, 2024
← PROJECTS Meneset on the Lake Sewage System GODERICH, ON Following a detailed assessment of the existing communal septic systems that serve the 262 home community in Goderich, Tatham Engineering designed, obtained an Environmental Compliance Approval and provided...
by Tatham Engineering | Dec 27, 2024
← PROJECTS Churchill Booster Pumping Station INNISFIL, ON The Churchill Reservoir and Booster Pumping Station located in Innisfil was developed to serve as a replacement for an existing reservoir and booster pumping station due to insufficient storage and a lack of...